[1] 曾敏,王乘,刘琼梅. 大规模定制板材排样的多种群蚁群优化算法,制造业自动化.2011,3,第5期,P59-62 中文核心
[2] Zeng Min,Wang Chen, Long Qiao-yun. Practices of Extreme Programming for ERP Based On Two-dimensional Dynamic Time Scheduling Interface Method, 2009 World Congress on Software Engineeringm,2009,5(3):236-239(EI检索)
[3] Zeng Min, Wang Cheng,LongQiao-yun. Based on Concurrent Engineering's Board-type furniture CAD/CAPP System, International Symposium on Computer Network and Multimedia Technology, 2009, 12(2): 1094-1098.(EI检索)
[4] Zeng Min, Wang Cheng;LiuQiong-Mei.The research on CAD/CAPP/CAM concurrent engineering of Panel furniture Agile Manufacturing, 2010 2nd International Conference on Industrial Mechatronics and Automation(ICIMA 2010),2010, v 1, p5-8(EI检索)
[5] Zeng Min, Liu Qiong-Mei,Wang Cheng. Practices of agile manufacturing enterprise data security and software protection,2010 2nd International Conference on Industrial Mechatronics and Automation (ICIMA 2010),2010, v 1, p 318-321 (EI检索)
[6] Zeng Min, Long Qiao-yu,Liu Qiong-Mei,Cellular Automata Variation Particle Swarm Optimization algorithm For Batch Scheduling,ISDEA2011,2011,12
[7] 曾敏.基于VB的平面切割辅助设计系统,机电产品开发与创新,2004,6 |